Factory construction
Wide-span factories for cranes and production lines
- [__] m
- Maximum column-free span
- [__] tonnes
- Overhead crane capacity
- [__]–[__] weeks
- Estimated build time
Who it suits
- Factories expanding a production line
- Businesses setting up a new plant
- Projects that need overhead cranes or heavy-duty floors
5 simple steps
No construction knowledge needed: we look after it from start to handover.
- Talk about your land and goal Tell us the plot size, location and what you want to use it for. Free, no obligation
- Design and return estimate We propose the building, the budget and the payback period. Within [__] days
- Contract with a handover date Every stage has a date in the contract. We handle the permit paperwork. [__] weeks
- Fabrication and construction Weekly progress reports with site photos. [__] weeks
- Handover, ready to use Handed over with full documents and a workmanship warranty. [__]-year warranty
Example schedule
Every project gets a weekly plan before signing.
Warehouse, 2,000 m²14 weeks in total
Design and approval
Foundations
Steel fabrication
Steel erection
Roof and walls
Handover
Weeks 1–3
4–7
in parallel with foundations
9–11
11–13
14
Weekly progress reports against this plan
[Why build with us]
[Two or three paragraphs on what makes this service strong]
Frequently asked questions
Can you extend next to the existing building without stopping production?
We sequence the work to disrupt production as little as possible. [Confirm with the engineering team]
Which design standards do you use?
[Design standards used]
What documents come with handover?
Mill certificates, weld inspection reports, as-built drawings and a building care manual.
Interested in something else?
Tell us your opening date,
we plan backwards from it
- A preliminary design and budget
- A weekly schedule with a handover date
- A payback estimate (for rental buildings)