Neovara
Request a quote

Warehouse construction

Rental warehouses and distribution centres

[__]–[__] weeks
Build time for a 2,000 m² warehouse
THB [__]–[__]
Construction cost per m²
[__] years
Estimated payback

Who it suits

  • Landowners who want monthly rental income
  • Investors looking for long-term rental property
  • Plots near main roads, industrial estates or logistics hubs
  • Companies that need their own storage

How many years to pay back?

Adjust the size and rent to match your location.

What do you want to build?
300 m²10,000 m²
THB 80/m²THB 600/m²
THB 4,000/m²THB 15,000/m²
40%100%
–years to pay back
Construction investment
–
Annual rental income
–

Estimate before operating costs and tax. Our team will calculate it for your actual plot, free.

5 simple steps

No construction knowledge needed: we look after it from start to handover.

  1. Talk about your land and goal Tell us the plot size, location and what you want to use it for. Free, no obligation
  2. Design and return estimate We propose the building, the budget and the payback period. Within [__] days
  3. Contract with a handover date Every stage has a date in the contract. We handle the permit paperwork. [__] weeks
  4. Fabrication and construction Weekly progress reports with site photos. [__] weeks
  5. Handover, ready to use Handed over with full documents and a workmanship warranty. [__]-year warranty

Example schedule

Every project gets a weekly plan before signing.

Warehouse, 2,000 m²14 weeks in total
Weekly progress reports against this plan

[Why build with us]

[Two or three paragraphs on what makes this service strong]

Frequently asked questions

I know nothing about construction. Where do I start?

Tell us the plot size and location. We propose the building, the budget and the payback period before you decide.

How much will it cost?

It depends on size, span, height and floor work. We estimate it from your actual plot. [Price range per m²]

Do I need a building permit?

Yes. Our team prepares the drawings and permit documents for you. [Confirm scope of service]

How long does it take?

A 2,000 m² warehouse takes about [__] weeks after design approval. The handover date is written into the contract.

Can it be extended later?

Yes. A PEB building can be lengthened from its end wall; tell us during design.

Interested in something else?

Tell us your opening date,
we plan backwards from it

  • A preliminary design and budget
  • A weekly schedule with a handover date
  • A payback estimate (for rental buildings)
Call [Phone]
Your goal

We use this only to reply about your quote. Privacy policy

Talk to our team on LINE

[Add the QR code in Customize > Neovara]

Scan the QR code or add us as a friend: [LINE ID]

Open LINE