Sports hall Court9 Silom by King Power
Silom, Bangkok
Indoor sports halls
Futsal, badminton, basketball: no columns on court
- 40 × 20 m
- Covers a full futsal court
- No columns
- on the court
- [__]–[__] weeks
- Estimated build time
Who it suits
- Futsal, badminton and basketball court operators
- Schools and organisations that need a gym
- Landowners who want a sports business
5 simple steps
No construction knowledge needed: we look after it from start to handover.
- Talk about your land and goal Tell us the plot size, location and what you want to use it for. Free, no obligation
- Design and return estimate We propose the building, the budget and the payback period. Within [__] days
- Contract with a handover date Every stage has a date in the contract. We handle the permit paperwork. [__] weeks
- Fabrication and construction Weekly progress reports with site photos. [__] weeks
- Handover, ready to use Handed over with full documents and a workmanship warranty. [__]-year warranty
Example schedule
Every project gets a weekly plan before signing.
Warehouse, 2,000 m²14 weeks in total
Design and approval
Foundations
Steel fabrication
Steel erection
Roof and walls
Handover
Weeks 1–3
4–7
in parallel with foundations
9–11
11–13
14
Weekly progress reports against this plan
[Why build with us]
[Two or three paragraphs on what makes this service strong]
Frequently asked questions
How high should the roof be?
It depends on the sport; we design the height to suit it.
Will it be hot inside?
Ventilation and roof insulation keep the heat down.
How long does it take?
About [__] weeks after design approval.
Interested in something else?
Tell us your opening date,
we plan backwards from it
- A preliminary design and budget
- A weekly schedule with a handover date
- A payback estimate (for rental buildings)